Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Al-Hajj, A N (1991) Simple cost-significant models for total life-cycle costing in buildings, Unpublished PhD Thesis, , University of Dundee.

Almalki, T S (2015) A study of the influence of trust on the relationships between team members in engineering projects, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs, Unpublished PhD Thesis, , University of Dundee.

Chitengi, H S (2015) Deriving lessons for urban planning and housing delivery from the resilience of informal housing systems in Zambia, Unpublished PhD Thesis, School of Social Sciences, University of Dundee.

Forbes, D (2008) Identification and analysis of risks in the sustainability assessment of housing, Unpublished PhD Thesis, , University of Dundee.

Gaber Abubakar, A (2016) Factors affecting maintenance labour productivity in the building industry, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling, Unpublished PhD Thesis, School of Science and Engineering, University of Dundee.

Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model, Unpublished PhD Thesis, , University of Dundee.

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Noor, I (1992) A study of the variability of labour productivity in building trades, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Saket, M M (1986) Cost-significance applied to estimating and control of construction projects, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

Simon, M (2010) The commitment to corporate social responsibility of construction companies in the United Kingdom and Germany, Unpublished PhD Thesis, , University of Dundee.

Taha, M (2022) Identifying legal frameworks impacting institutional investors' participation in infrastructure projects, Unpublished PhD Thesis, , University of Dundee.

Talhouni, B T K (1990) Measurement and analysis of construction labour productivity, Unpublished PhD Thesis, Department of Civil Engineering, University of Dundee.

  • Type: Thesis
  • Keywords: labour; productivity; measurement
  • ISBN/ISSN:
  • URL: https://ethos.bl.uk/ProcessOrderDetailsDirect.do?documentId=1&thesisTitle=Measurement+and+analysis+of+construction+labour+productivity&eprintId=334262
  • Abstract:
    An analytical approach for explaining the variability in labour intensive construction operations has been developed. A consistent method of collecting productivity developed jointly at the Pennsylvania State University and the University of Dundee has been refined and tested. Data has been collected daily from seven Scottish sites for continuous periods of up to 3 months. Not only productivity but many of the factors affecting it have been measured. A comprehensive, computerised database has been designed to facilitate data storage and manipulation. The quantification of the impact of each individual factor is based on the assumption that deviations from an operative?s normal output arise because of disturbances imposed by a multiplicity of site factors. The impact of each individual factor causes the average daily productivity to change.

Thomson, C S (2006) A study of the innovation process within the construction project environment, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Ward, S A (2015) Critical success factors for lean construction intervention, Unpublished PhD Thesis, Division of Civil Engineering, University of Dundee.

Whitehead, R C (1995) Factors influencing labour productivity on construction sites, Unpublished PhD Thesis, , University of Dundee.

Zakieh, R (1991) Quantity-significance and its application to construction project modelling, Unpublished PhD Thesis, , University of Dundee.